GanttMan is a Gantt chart-based project management app that helps you represent a project schedule, visualize planned and actual duration, start and finish dates, milestones, etc. The app has all the features you would expect in scheduling and management software, including task and resource management, project planning and reporting, interactive Gantt charts, and more. It features a Gantt chart view that displays tasks, task dependencies, and time tracking information in one interactive layout.

The app is designed to be simple enough for the average user to understand and use yet powerful enough to be useful for professionals in project planning, resource allocation, and workload management. It provides you with the functionality you need to produce professional, high-quality project schedules. Thanks to the system of notification emails, you can ensure timely delivery of your projects even if you are not during your work hours.

GanttMan screenshotGanttMan screenshotGanttMan screenshotGanttMan screenshot

Ranked alternatives

  1. 1

    Instagantt is an online Gantt chart software that allows you to manage tasks and projects. It is possible to manage not just small teams and projects but also large-scale operations. It has a Windows client application that allows you to work with your project offline and has many features for easy time tracking and reporting. You can use it for the management of developing websites, software, mobile applications, and other types of products. Work smarter and stay organized; Instagantt creates beautiful project schedules that help you meet deadlines with ease.

    The templates are optimized for mobile devices, so you can be more productive on the go. Key features include Task Management, Task Assignments, Team Management, Resource Management, Milestones, Project Documents, Project Calendar, Project Reports, etc. You can also invite your team to collaborate on your project. Then you assign tasks to various members of your team. Each milestone is a great opportunity to take stock of your project, measure successes, and plan for future goals.

    Instagantt alternatives
  2. 2

    GanttPro is an online application that allows users to create project Gantt charts, organize tasks and manage project schedules. Users no longer have to rely on outdated project management software or Excel charts that often leave out crucial details. You can create professional-looking Gantt charts with no design skill required. It offers an easy drag and drop interface that makes it simple to create professional-looking Gantt charts in a matter of minutes. It could be anything from a wedding planning schedule to a project management plan for your upcoming business venture.

    Once you are done setting up your schedule, you can download all the work plans at once in a PDF document. Moreover, you can also share the Gantt chart with your colleagues and friends to give them a quick overview of what needs to be done. In addition, its interactive graphical representation of the project helps you to make any changes while maintaining uniformity. Moreover, you can also make use of icons and images which are available in the software to add more information regarding the tasks, resources, milestones, and so on.

    GanttPro alternatives
  3. 3

    DHTMLX UI is a JavaScript UI library that allows you to develop web apps with HTML5 standards. The library allows you to build web interfaces for different platforms and browsers. Its modular structure allows you to use the components needed to create an application and ignores the components that are not needed. This is one of the reasons why even a small library size is very important. It allows faster loading of web pages and saves traffic on cellular networks.

    The advantage of using DHTMLX UI is the ability to use its components with no need to learn JavaScript at all. They are easily integrated into the development process of websites created by any popular desktop programming language. Every page of the editor has its own interface elements, which creates a great number of routine tasks. All in all, DHTMLX UI is a great tool that you can consider among its alternatives.

    DHTMLX UI alternatives
  4. 4

    Agantty is a project management app that helps you manage projects, timelines, tasks, and people and let yous on the work that matters most. It helps users keep a close watch on their projects and ensure that their teams and plans are working according to schedule. This intuitive app gives companies and teams a friendly interface to define the scope of their projects, brainstorm, manage resources effectively, and complete projects under budget.

    It starts with the planning stage, where users can draw out the various phases and milestones of the project using cards. With Agantty, you can then sort out all the tasks easily with drag and drop. It has been a favorite project management application for many team leaders and freelancers. It is easy to use, modern, and well-designed. All in all, Agantty is a powerful tool for managing projects, tracking time, collaborating with your team, setting priorities, and keeping track of your work.

    Agantty alternatives
  5. 5

    dotProject is an open source project management software that you can use to plan, organize and track your projects. You can easily manage time, tasks, and resources for any kind of project without having to rely on an IT department. The flexibility of this fully-featured, cross-platform project management solution is probably its biggest advantage.

    The modular architecture allows the user to configure the existing set of features and decide what should be available to him/her. It is also a helpdesk system for handling requests, tasks, and events. It’s possible to assign tasks to other users or external customers or to leave them for later. There are also reporting tools, ticketing capability, and much more.

    dotProject alternatives
  6. 6

    Gantt.io is a web-based Gantt Chart designer tool that helps teams plan, monitor, and manage projects. It lets you display a project schedule, critical thinking, and a planning tool that helps you effectively visualize and coordinate tasks. Businesses create professional-looking Gantt charts in minutes without having to use complex software for project scheduling or even being a technical person.

    The Task Sheet feature allows you to drag and drop projects, sub-projects, and tasks from the Pile onto the Task sheet. This makes it very intuitive and easy for users to move around within their project, set start and end dates for any task, and add details about that task. Gantt.io also allows users to connect with their Calendar and import events into their projects, which makes it especially valuable for businesses with lots of events that need to be scheduled into their projects.

    Its charts are made up of bars, lines, and markers, which are all resizable and movable to ensure that you’re able to create the perfect-looking spreadsheets you’re looking for. This allows you to make the most of your data to make sure that you get the best results possible.

    Gantt.io alternatives
  7. 7

    Online Gantt is a web-based project management and Gantt chart tool that allows you to handle the process of planning and controlling projects. With this software, you can monitor the deadlines to ensure the product or outcome quality, customer satisfaction, and much more. Create a project and add tasks via drag ‘n drop, change their type and due date, customize your project with colors, labels, and more.

    With this tool, you can collaborate online, Monitor your projects with an interactive chart, Add attachments to your project tasks, see information about charts, tasks, and more, see all tasks from the Gantt chart, and Export a Gantt Chart PNG/PDF for every task. Whether your team is onsite or distributed around the world, GanttPro makes project management and scheduling easier by organizing all your tasks in one place. Its online interface makes it easy to connect with teammates, share Gantt charts, track progress and stay on schedule.

    Online Gantt alternatives
  8. 8

    Project Office: Gantt chart is a project management app that allows users to manage tasks and schedules based on a Gantt chart. In the Gantt view, you can see the project timeline that divides days or weeks according to project tasks. You can also see how much time will be spent on each task, how many resources you’ve got for each task, and even how many people are working on each task. The Gantt chart view helps you keep a detailed picture of your project status in mind.

    The visual representation of the project timeline helps you understand that if some of your fixed milestones slip by, then you’re likely to miss some of your target dates. It can be used to track the time and costs of any large project, small business, or personal activity. The app includes a planner that allows the user to make schedules in advance and is able to display them in various ways. It also offers users the option to import external information such as files for each project, task, and resource.

    Project Office: Gantt chart alternatives
  9. 9

    Creately Gantt Chart Maker is a web-based diagramming software that helps you to create flowcharts, organizational charts, UML diagrams, network diagrams, business process diagrams, etc. It helps professionals in creating workflow diagrams, enterprise application diagrams, application architecture diagrams, business process diagrams, website wireframes, software design diagrams, and website maps with no software installation required. Key features include project hosting, organization account management, organization chart storage, Gantt chart storage, Team management, etc.

    It is aimed at organizations that have to manage long-term initiatives or tasks, like IT projects and product development, and need to track the performance against set objectives and deadlines. It is easy to use, as it provides a step-by-step wizard for creating new projects, setting up tasks, and adding resources. Creately, Gantt Chart Maker is designed to save time and effort as it encompasses a number of features that make project management much easier.

    Creately Gantt Chart Maker alternatives
  10. 10

    StudioBinder is a video, TV, and film production management platform that helps the community of creators manage projects, collaborate with colleagues, and organize the details of their day-to-day film and video production. The software’s core focus is helping studios and productions manage budgets, schedules, locations, talent, and equipment. The software can be customized by the company to meet your production and brand needs.

    You can create customized call sheets and track the people that have to be on site. Scripts can also be written and tagged with elements that help the actors. Moreover, there’s also a storyboard builder, contact list, calendars, task dashboard, files, and comments section. All this is done via the drag and drop interface. Put away the shot list and storyboard template. Add shots, specify shot sizes, types, movements, lens, gear, and more. Get a quick glance at progress, conflicts, and plan to add more.

    StudioBinder alternatives
  11. 11

    Timeline Hero is an online project planning, visualizing, and tracking software for teams that want to improve their workflow and be more organized. This project management application allows people to collaborate and communicate their ideas from any device. It is built on a flexible and agile platform that provides real-time updates and online collaboration, regardless of time differences. With this tool, you can simply set up projects and start managing them right away with no installation required. This way, you save time and money on installation, maintenance, and upgrades.

    The software helps businesses run projects with full transparency while giving you a bird’s eye view of the entire process. It enables you to invite your colleagues to work together within a single network. The application is designed so that you can mobilize the whole process and make all the data available at any time and from any place. The software allows you to create a list of steps and activities that are related to each other. Each activity is defined by its name, duration, start and finish date, responsible team member, cost, a description of the activity, notes, attachments, and more.

    Timeline Hero alternatives
  12. 12

    OrangeScrum is a web-based, collaborative, and lightweight project management solution that is available both on the cloud or self-hosted. It is created for SMEs who have little understanding of the software and project management industry, as well as for organizations struggling with the current software solutions available on the market. Focused on openness, extensibility, and flexibility, OrangeScrum is a simple to use and yet powerful tool that covers all your needs in managing projects and teams.

    Its powerful tools will allow you to organize, plan and get work done more efficiently. The intuitive interface allows teams to instantly create and collaborate. Set up your workflow, custom fields, and billing rates to streamline your projects. The time tracking features include resource availability, time log, weekly timesheet, billable hours, project budget, and cost. All in all, OrangeScrum is a great project management software that you can consider among its alternatives.

    OrangeScrum alternatives
  13. 13

    Visual Paradigm Online is a Gantt chart-based project scheduling tool that you can use to create tasks and have a beautiful timeline of the project progression with time. This can be shown in bar, line, and area charts. There’s a dashboard is where the user will log in, and it will show all the projects that the user has access to. The Projects library shows all of the projects that the user has created or added. Project managers can visualize schedules, timelines, and deadlines.

    This feature helps project managers to have a clear and detailed picture of the project schedule. The Gantt charts are also useful for other roles such as marketing, sales, and even product development. Within Visual Paradigm Online, you can share your projects with other colleagues to collaborate and delegate tasks more effectively. Manage multiple projects in one place with the help of this Gantt chart tool.

    Visual Paradigm Online alternatives
  14. 14

    SmartDraw Gantt Chart Software allows individuals and businesses to plan, track, and report on projects, programs, and budgets. You can create a Gantt chart quickly and easily without having to know software code or complicated charting syntax. By using this tool, you can easily determine when each task needs to be completed in order to finish the project on time. Tasks can also be organized and prioritized that need to be completed sooner.

    Use the intuitive SmartDraw Wizard to create, edit and share professional-quality Gantt Chart templates and project schedules with just a few clicks. The software allows users to organize project tasks with simple drag-and-drop functionality and utilizes other features to help users anticipate potential problems and keep track of their progress. Features include the ability to create a personal profile, add tasks and subtasks, view the team’s progress, track time spent on the project, and add comments regarding project activity.

    SmartDraw Gantt Chart Software alternatives
  15. 15

    Backlog Gantt Chart Creator is a project management planning tool that helps you prioritize your projects, goals, and tasks. This tool allows you to plan your upcoming events, track your projects and collaborate with your team members. It’s designed to work well with any agile tool and can be used for managing teams, project planning, software development, and more. The software enables you to create projects in a representation of a project’s timeline, showing the different milestones and related tasks.

    Backlog Gantt Chart Creator offers tons of customization, including setting start and end dates and adding milestones to represent checkpoints in the project. The interface is simple, making it easier for the users to understand the different features of the software. Some of the other features include task prioritization, which enables users to set priorities for their tasks, which means that time can be utilized more efficiently. It also utilizes an email integration feature that enables users to send out reminders and updates regarding the project.

    Backlog Gantt Chart Creator alternatives
  16. 16
    WrikeFree

    Wrike a traditional task management tool for project management. Managing the project is a more difficult task as compared to planning the project. It becomes even harder to manage them and take them to the result of large and mega-sized projects. Well, this is a platform that combines project management with a real-time workspace for collaboration, discussion, and data sharing.

    Today thousands of companies are using it to manage their projects by utilizing the team collaboration advantages. It basically combines those users who are directly or indirectly attached to any project and then makes it possible for them to collaborate, discuss important matters regarding projects, and share resources and documents with each other. It will assist everyone in viewing the real-time picture of the project performance. The deadlines that will be available for those who are part of the team will assist users in performing their best. It is integrated with all those resources that are crucial throughout the project management process.

    Wrike alternatives
  17. 17

    Jira Software is a project management and tracking platform that is designed for every member of your team. Plan your project by creating milestones, setting due dates, and assigning tasks to your team fellows. Management can also prioritize and take action on what is important and stay up to date with everything your team does. So, use this tool and improve the performance of your team and easily manage your project.

    If you don’t like to use dozens of tools separately to manage your project, then Jira Software is the perfect platform for this purpose because you will find the best project management and tracking tools on a single platform. You can easily create the tasks and can prioritize them as well. Its team collaboration system will assist everyone in the team to view the full visibility of ongoing performance at any time. Its main advantages are knowledge management, development workflow, continuous integration, and real-time collaboration.

    Jira Software alternatives
  18. 18

    Basecamp is a highly advanced project management platform that delivers the management to assign tasks and roles of every individual in the project. It can be easily accessed from any operating system and browser. Moreover, it also includes built-in email services. So, use it and improve the performance of your team and easily manage your project.

    After the signup process, you will be provided with a secure and private platform for your task. You can manage your entire project and act on tasks, discussions, deadlines, files, and all those processes that are directly or indirectly attached with your project. You can also invite those who are part of that project and can also view the progress anytime. The main advantages and features of Basecamp are the availability of the message boards, comments threads, real-time chat, automatic check-ins, to-do lists, docs & file storage, and a centralized scheduling platform.

    Basecamp alternatives
  19. 19
    TrelloFree

    Trello is a highly personalized project management platform that alternates other outdated spreadsheets, sticky notes, and clunky software. Instead of outdated techniques, use this tool and get everything about your project on a single platform. Add as many people as you required and drag them to cards to assign tasks to them. Having a project management platform is not enough unless it provides you with a flexible system of organizing and managing everything.

    The best about Trello is that being a customizable platform automatically adapts to the project, team, and workflow. Using this web-based platform, the project management and those who are part of the project can visualize everything about their project in a centralized place and all in real-time. This platform’s drag and drop feature makes the work even easier by allowing the team members to view the performance.

    Trello alternatives
  20. 20
    AsanaFree

    Asana is a web-based project management platform that allows the project managers to create the task they plan or need a teammate to do rather than sending them an email. Use it and organize your tasks into a shared projects environment for your initiatives, meetings, and lists. All necessary features for a project are a part of this tool like a search facility, integrations of multiple tools, attachments from cloud storage services, mobile support, tasks directory, due dates, calendars, and a high-level dashboard.

    Using this tool, you can start any project, either recruiting a new team, purchasing supplies, making budgets, planning for the next annual general meeting, or anything else similar. You can set individual responsibilities that will be viewable by the other team members as well. Instead of making the list of tasks separately on the spreadsheets and then mailing them individually, it is better to use Asana to create tasks and let other members see them automatically all these easily.

    Asana alternatives
  21. 21

    Adobe Workfront is the best project management platform that is the best option for marketing teams, IT teams, services teams, and everyone. It is also known as Enterprise Work Management. This web-based solution lets the project managers and executives manage all your work, projects, and task in one place. This platform comprises only those tools that assist the project management and team members in focusing more on the important parts of the project.

    Adobe Workfront is a platform that makes it possible for its users to communicate in real-time and enjoy the advantages of real-time project tracking and reporting. The basic sections of this platform are better workflow, work management, visualizing work in real-time, accessing work from anywhere, and then the availability of a marketing work platform.

    Adobe Workfront alternatives
  22. 22

    Redmine is a flexible project management platform that can be deployed for multiple projects. Being a cross-platforms and cross-database, it lets its users create their own projects. After creating projects, the project managers will be provided with the project administration features in a simple form. Its main features include the support for multiple projects, flexible role-based access, tracking system, real-time collaboration, files management system, support for the usage of Gantt charts & calendar, email notification system, time tracking, and a lot of others that will assist the managers in overcoming the issues of project management and team management easily.

    Having a project is not enough unless it is well designed and well managed. The best thing about Redmine is that it supports multiple projects, meaning the project managers can start more than two projects and manage them simultaneously. This project management and team collaboration platform allow the PMOs to get complete command and control over their projects from the designing stage to the finishing level.

    Redmine alternatives
  23. 23

    LiquidPlanner is a multitasking project management platform that is basically designed for IT companies and projects. It makes prioritizing, organizing, and scheduling simple. It is a platform to handle every task and client from a centralized platform. Its predictive scheduling engine lets the PMOs update project dates easily and enhances the business’s proficiency. Then there is an advanced analytics platform of this tool that is missing in most other task and project management platforms.

    LiquidPlanner is among those few project management platforms that, in its dashboard, provide the analytics in the shape of reports from where the PMOs can track and monitor the real-time performance of the business. The project managers can easily get in-depth insights into the business in a highly customizable view system by utilizing this feature. This tool offers predictive schedules, remains updated all the time, case estimation according to best and worst, portfolio-level planning, and intelligently manage workload.

    LiquidPlanner alternatives
  24. 24

    Easy Redmine is a collaborative project management platform to enhance the team’s performance and boost the productivity of the business. It currently provides solution collaboration, issue tracking, resource management, finance management, and customer management. The best above all is that it is an open-source and cross-platform application that allows the project manager to utilize its customizable features to use it according to the requirement of the project and company. It is specially designed to manage a complex project that requires the collaboration of 10 to 100 users simultaneously.

    Suppose you want to manage an entire project along with entire team members, then Easy Redmine will provide you all crucial project management tools to complete your projects on time, in scope, and on budget. The best about this tool is that it, in addition to having its own independent architecture of plugins, supports third-party plugins to extend the working features. Using this tool will get instant and free access to the time-saving features, smart Gantt chart, quick project planner, project templates, resource management, and many more.

    Easy Redmine alternatives
  25. 25

    ProjectManager is a project manager to manage the project from simple to complex level by organizing them by creating a plan first and then managing team workload along with allocating the resources and, in the end, monitoring the performance of both team and projects in real-time. Planning, tracking, and reporting are the three main areas of services of this platform. In the planning section, the project managers and executives can create and share the customizable plans and collaborate with the other team members.

    After creating the plans and assigning the task and resources to everyone, the PMOs can then track the real-time performance of the team members on the dashboard. They can monitor performance according to time, resources, budget, and team workload. Use ProjectManager and empower the team members to manage all types of tasks and projects, either single or multiple, simultaneously.

    ProjectManager alternatives
  26. 26

    Active Collab is a task management and team collaboration platform that provides the project managers and executives with client work management, invoicing project management, and dozens of other features in one place. There is no requirement to bother scanning through loads of emails, spreadsheets, and chat transcriptions to locate the documents you are looking for. This project management platform provides the users with the system of tracking the time, project, and expenses and capturing the mistakes early.

    Active Collab can be utilized for various management purposes, either it is about managing a simple project or complex projects. Task management, team collaboration, time tracking, and invoicing are the four main areas of service. It is a way to keep the team organize all the time. In addition, there is a proper add-ons architecture that allows the users to extend its features to its own integrated tools and functions.

    Active Collab alternatives
  27. 27
    HuddlePaid

    Huddle is a project management and team collaboration platform for private and government agencies and companies. It lets the PMOs and executives instantly share the important files with partners and team members and design tasks to get the work done accurately. It is one of the best team collaborations platforms in the cloud. The best about this tool is that it is integrated with those resources for almost all types of companies and agencies, either accounting & consulting, architecture, construction & engineering, transportation & utilities, healthcare & life sciences, advertising, marketing, and media.

    Huddle has made the process of collaboration and working with team members from any part of the world very simple. It is a platform for managing client projects, controlling documents, and securely sharing content with authorized team members. The authorized team members and the project manager can share & edit files, post comments, assign tasks, track team activity, and monitor the project’s performance. The performance of the project can be monitored in the shape of reports and graphs as well.

    Huddle alternatives
  28. 28

    ProjectPier is a tool that is used for organizing and managing projects, tasks, and teams from a user-friendly platform. Although it can be used for managing various types of projects, it is also suitable for managing web-based projects and group collaborations. It provides the project managers a flexible environment for managing projects that involve the entire organization and provides them a centralized platform from where they can monitor the entire activities of the team members.

    It is totally free software that can get full command and control over the projects, tasks, communication & collaboration, file & data sharing, and many others. ProjectPier is a cross-platform program and can be used and accessed from any operating system. However, unlike other project management programs, it is required to be installed on a user’s web server.

    ProjectPier alternatives
  29. 29

    Genbook is the most convenient online scheduling and booking software that allows you to connect with tens of thousands of local service professionals to find, book, and even pay from your desktop, smartphone, and tablets. It is an all-in-one tool that allows you to manage your appointments, business, and staff online and get all the real reviews from verified customers to boost your reputation across the web. It is a simple and easy-to-use software with more than 7.5 million users worldwide and supports multiple languages, including English, Spanish, Chinese, and French, etc.

    Genbook also includes core features such as receiving and monitoring reviews, accepting online payments, delighting customers, scheduling web pages, unlimited appointments, flexible booking options, customized calendars, customer contacts, and all the other advanced tools. To enjoy the service, you need to download and install it on your device. After completing the installation, you can easily enjoy its complete services without any limitations. Genbook has different price plans, and each plan has its own features and price. Do try it out; you’ll be amazed at all the things on this exciting platform.

    Genbook alternatives
  30. 30

    Mindbody is a club management software targeting health and wellness companies to help them effectively their market and business operations. The solution helps automate business tasks such as payment collection, confirmations, rescheduling, and payroll processing. It is an easy-to-use software, and effective market tools enable the organization to stay in touch with their clients and integrate promotions at the point of sale. It allows creating gift cards and starting promotions and loyalty programs. The solution helps businesses grow by providing them with the necessary tools to manage their resources and automate their business tasks effectively.

    One of the best things about this tool is that it allows the clients to book appointments at their convenience using the device, while their visit history and payment details are stored in a single and easy-to-manage profile. Its marketing tools allow sending the rights message to potential customers and then track the results. Mindbody also offers many prominent features such as online booking, online store, POS, payroll, auto-billing, promotion and gift cards, etc. With a simple and user-friendly interface. Overall, it is one of the best cloud management software as compared to the others.

    Mindbody alternatives
  31. 31
    Pike13Paid

    Pike13 is a club management software specially designed for the need of personal services franchises and businesses. It offers effortless scheduling, client management, and payment processing. The solution can be custom branded to fit your enterprise look and feel. On top of that, you can manage your business from any desktop computer, smartphone, and tablet. It empowers you to track revenue, sale, and retention rates with real-time analytics and reporting.

    With the help of this application, you can schedule appointments, workshops, and classes with clients anytime, anywhere around the world. You can also automate class waitlists, update or confirm the class roster, sign clients into class, and track attendance counts. It also helps you manage staff payroll and accounting for commissions, tips, business, and variable rates. Pike13 also offers lots of key features that help you to manage your daily task. It has three enterprise plans such as Business Plan, Pro Plan, and Enterprise plan.

    Pike13 alternatives
  32. 32

    EZFacility is a web-based software service that streamlines business day-to-day operations. The software is specially designed to meet the needs of fitness clubs and sports venues. It is also known as all-in-one club management software that allows you to schedule classes and manage different facilities for training and exercise. The tool keeps your clients updated with all the important changes and notifications. One of the most interesting and enjoyable things about this platform is that it offers multi-scheduling options that save you a lot of your time.

    EZFacility also enables you to manage daily affairs, including class scheduling and meeting with individual clients also becomes a breeze; whether it is the instructors or your member, you can connect with them at any point in time. The tool also includes core features such as employee time clock, POS, credit card processing, analytics, self-service for members and reporting, etc. Like the other similar platforms, it also has multiple price plans; each has its price and features.

    EZFacility alternatives
  33. 33

    ClubExpress is a web-based platform for carrying out the management and operational tasks of clubs and associations. It handles and automates all cumbersome operations from art to educational clubs and environment clubs to the international club. It is a simple and easy-to-use program that offers lots of advanced tools to manage your complete tasks. The solution offers a massive list of features and benefits about the effective management of members daily.

    Whether you have 10 members or 10,000, the tool keeping the record of members and their profiles is quite cumbersome. You really need to incorporate this club management software which automates the complete process from the start to the end. Still, it will also give a separate database for the outsiders who occasionally show interest in the club’s events. To make the service more interesting, it offers key features such as association membership, website management, member directory, member portal, and social media integration, etc.

    ClubExpress alternatives
  34. 34

    Virtuagym is an all-in-one club management software that allows trainers, fitness clubs, and coaches to manage the day-to-day operations of their club. With the help of this solution, fitness professionals can focus on effective fitness coaching and run a successful business. One of the most interesting things about this application is that it offers custom-branded apps and a massive online community that promotes a club or a trainer’s brand and boosts client engagement. It offers flexible membership options, and lots of hardware integrations offer ample opportunity for rapid and sustained revenue growth.

    Virtuagym allows businesses/clubs to accept payments in different forms like cash or direct debit cards with automated online payment modes. This tool has an automated check-in feature that businesses can use to monitor and track the member’s access to the web portal and application built-in with tag scans or RDIF cards. It can be a helpful tool to rationalize the member inflow and outflow towards the checkout page and indicate how well the business performs at a different time in a day. Just like the other similar software, it also includes core features that make it better than others.

    Virtuagym alternatives
  35. 35
    10to8Free

    10to8 is a club management platform that helps you communicate with clients more professionally and with transparency that reduces no-shows and prevents schedule conflicts. It is a simple and easy-to-use cloud-based application that also features enterprise-grade volume appointments. It is also known as a tool that can drive more clients for appointment-reliant businesses, including beauty & salons, sports & fitness, tradesmen, and other professional services.

    This solution also drives your client traffic and boosts revenues in effect. The most interesting thing about this tool is that it allows you to book customers online and expand your market reach. This platform features Manage multiple appointments, reporting, audit trails, activity logging, customization fields, role management, etc.

    10to8 alternatives
  36. 36

    Smartsheet is a web-based tool for your task management, project management, sales pipeline tracking needs, and more. It is a leading enterprise collaboration tool that offers businesses an innovative way to collaborate on projects and processes. It is a simple and easy-to-use tool, and you can access it from any browser and device. The platform has thousands of users worldwide who can use it to track their finances, inventories and schedule and manage diverse work such as programs, projects, and all the core business operations.

    Tracking, Planning, Automating on work are the key functions of Smartsheet. It is an extremely powerful project management tool that provides a targeted solution based on various factors. The program includes core features such as contact management, discussion board, automated reporting, social media, custom branding, file sharing, etc. Overall, Smartsheet is one of the best project management tools for everyone.

    Smartsheet alternatives
  37. 37
    ScoroFree

    Scoro is a cloud-based business management tool targeted at small to medium entries, specifically those in advertising, information technology and consulting, etc. The solution offers such companies features that include collaboration, tracking, work scheduling, customer relations management, project management, etc. It is a user-friendly interface complimented by eliminating the need to switch between solutions and emails clients. It can save precious time for project management; companies can add tasks that make the process event faster easily, which can readily link to the client.

    Scoro includes prominent features such as custom tags, task management, late invoice reminder, lead management, custom filed, multi-language, automated alert, comparative report, financial reporting, etc. It also offers CRM that attracts more audiences worldwide. The software is available in three pricing plans, and all the plans requiring a minimum of five users; these plans differ only the features that users can access with higher price plans. Do try it out; it is one of the best cloud-based business management software compared to the others.

    Scoro alternatives
  38. 38
    PODIOFree

    PODIO is a project management and collaboration solution that helps team communication and organizes things to facilitate tasks and projects. It is also known as an all-in-one collaboration software that allows systems to put content, context, and conversation in one place. Your team gets to work in sync and allows people to concentrate on what needs to be done with clarity and efficiency. Each function of the platform lets you consolidate content and communication into easily searchable tools.

    The great thing about this platform is that it also has tools for social collaboration, file sharing, task management, calendar, meeting scheduling, integrated chat, etc. All the team records created inside your apps can be displayed using a wide selection of layouts, including simple tables to cardboards to visualize and organize your work. It also provides you with visualized reports to gives you a clear overview of your team’s work progress. These reports enable you to view and display project budgets, time remaining on deliverables, and more. Like the other similar collaboration software, it also has multiple price plans, and each plan has its own price and features.

    PODIO alternatives
  39. 39
    IQTellFree

    IQTell is a productivity application that lets you manage email, tasks, projects, contacts, and calendars, etc. in a single application. It is available to use as a web application as well as an Android and iOS app. It is also a known all-in-one productivity solution that offers a variety of tools to create large projects.

    The app introduces a new deadline system that will remind you when something is coming up. Just like the other similar applications, it also offers a customization option that allows you to create your setting and templates to do a complete commercial use project. IQTell is fully functional while offline and syncs data between your devices and the web when online.

    Your email, contacts, projects, and the task at your fingertips wherever you go. Push notification, customization, complete email functionalities, and task management. These are also a feature in the application. Do try it out if you need a powerful productivity app.

    IQTell alternatives
  40. 40

    KickoffLabs is a compelling landing page creation platform that helps digital marketers, agencies, startups, and eCommerce businesses develop conversion-focused landing pages for their campaigns. It is a simple and easy to understand solution that comes with all the primary tools and services to create a great landing page. The tool combines the power of landing pages that are optimized to increase conversations and widgets can be used to capture lead viral, regular follow-ups through automated email campaigns, and social media referrals that goal at boosting popularity.

    This landing page creation tool comes with a library of more than 60 landing page templates that can be edited using its flexible page builder. With the help of this system, you can also be able to run A/B tests to determine which of your landing pages are generating more traffic and conversations. It also introduces a robust viral boosting system that permits the giving away of rewards to leads for your referrals and launching of referral contests, invites friends, and become active advocates.

    KickoffLabs also has an analytics system that attracts more audiences around the world. It includes core features to create and publish pages in minutes, customize email content, leaderboards, and lots of marketing tools, etc. There are multiple SMB and enterprise plans; each plan has its own cost and advantages.

    KickoffLabs alternatives
  41. 41

    SinglePlatform is a web-based platform that connects you to the top search engines, travel and review sites, mobile applications, online listing, and directories, etc. It is a simple but powerful platform that uses unique technology, partner network, and support team to drive local business success. The platform is specially designed for local businesses who want to increase their productivity.

    From listing optimization and mobile site creation to social media scheduling, you’ll find all the tools you need to get your most impotent information out across the web. With the help of this application, you can save your lot of time, enhance online and mobile listing, and stay informed.

    SinglePlatform starts with a fundamental level and knows it has millions of users around the world who can use it to manage their local business. It also has a list of core features that make it more exciting and better than others. Try it out; you’ll be amazed at all the things on this stunning platform.

    SinglePlatform alternatives
  42. 42

    SAP ERP is an enterprise management solution that has all the capabilities of supply chain management, human capital management, product lifecycle management, financial management, and customer relationship management software. It can be deployed as a SaaS service, on-premise, or as a hybrid model.

    The solution boasts a customer base of 172000 businesses worldwide, with the help of this platform you get to have access to vital applications, analytics tools, and data, which can significantly help you streamline your processes and support organizations to become more competitive. The solution can also help you in managing your entire organization making tasks, including product planning and general ledger reporting far easier.

    To make it better than others, it includes lots of tools and services such as procure to pay, order to cash, core finance and request to service, etc. SAP ERP also has several technical features that can significantly benefit your organizations. Its applications are some of the best of their kind as they are built around software integrations. You are likewise able to take advantage of add-on cloud modules that can easily integrate with the software. Like the others, it also has different SMB and enterprise plans, and each project has its features and costs.

    SAP ERP alternatives
  43. 43

    Freshservice is an IT service desk software, provides plug and play ITIL that complies with best applies without the need for expensive talks or expert opinions. It is a top-rated cloud-based customer support platform that was founded with the mission of enabling companies to provide the best customer service. Its core functionalities, including robust ticketing, asset discovery, accessible knowledge, and CMDB.

    The solution is equipped with capabilities such as vendor management, problem management, change management, and release management that attract more audiences around the world. It will also do great work analyzing and resolving problems before they’ve had whatever impact on your business’s productivity. It ties sudden events to common issues and keeps all issues recorded in a known-error database until you have come up with a permanent solution.

    It is a cloud-based solution that is easy to install, low maintenance requirements, and effectively run on autopilot. Freshservice includes core features such as primary ticketing, time tracking, IP whitelisting, SLA management, MSP plugin, and custom mailbox, etc. It has a flexible price plan that is scalable to the size of the businesses and depends on what the user needs.

    Freshservice alternatives
  44. 44

    Bloomfire is a leading enterprise knowledge and collaboration solution that taps the collective wisdom of your employees or customers. It is a simple and easy to use tool that has thousands of users around the world who can use it to manage their system. This knowledgebase designed to engage users in open, honest knowledge sharing to make the company more innovative and profitable.

    The solution works by capturing, archiving, and growing the primary knowledge that already exists within your organization. It is also known as a social knowledge network software that helps people get their jobs done.

    Just like the other similar software, it also includes core features such as unlimited groups and sub-communities, support videos, presentations, role-based management, content moderation, gamification and customizable, etc. With a simple and user-friendly interface. Overall, Bloomfire is one of the best collaboration systems as compared to others.

    Bloomfire alternatives
  45. 45

    StyleSeat is an online destination for beauty professionals, salons, and barbers by managing their appointments, marketing, and client relationships. It is a free and easy-to-use platform that is also available to use on Android and iOS platforms. With the help of these applications, the client can search and book an appointment in its expensive directory of professionals offering hair, beard, waxing, and all the other related services. It offers a 24/7 receptionist system that allows you to book appointments online whenever and wherever you are. It offers a full suite of tools and services to manage your business and deliver a seamless experience for your customers, including appointment management, import contacts, auto sync with google calendar, 24/7 online booking, etc.

    Another great thing about this application is that it accepts payments with express pay that enable your clients a seamless checkout experience, now show and late cancellation protection, and chargeback assistance. To make it better than others, StyleSeat introduces many marketing features for those professionals who want to promote their business. It also includes many prominent features such as import photos, google search booking widgets, create a profile, photo gallery, customization email marketing, automatic appointment secluding, and more. Try it out; it is best for both clients and professionals.

    StyleSeat alternatives
  46. 46
    VoxoxFree

    Voxox is a business communication app that processes billions of calls and messages for customers ranging from global brands to sole entrepreneurs and everything in between. It is a complete office phone system solution that combines enterprise-level features at a small business price with VOIP enabled low rates and high availability.

    The app offers a cloud phone service with a mobile companion app that allows you to work anywhere around the world. Use your mobile phone to manage your business calling and answering needs from anywhere.

    One of the best parts is that it automatically answers and routes your calls with professional, personalized greeting and menu system instantly, giving callers the image of a large company. The app features unlimited phone extension, auto attendant call answering, free business text message, business phone system feature, and low rate call.

    Voxox alternatives
  47. 47

    Microsoft Project Server is a project management server system introduced by Microsoft in 2000. It uses Microsoft SharePoint as its foundation and supports interface from either Microsoft Project as the client app or by web browser connecting to its PWA (project web App) component. The solution is designed to extend the capabilities of Microsoft Project with Project Server and PWA and store project information in the central SQL Server database that is protected from unauthorized access and corruption. Its Project Administrator can also control the security defining users and access rights.

    Microsoft Project Server is a simple and complete solution that delivers a new and intuitive way to plan, manage and collaborate with multiple teams and individuals from meeting important details on choosing the right decisions. The solution enables businesses to start & manage the complete project and deliver success with the intended business value and gives businesses a powerful, visually enhanced way to manage a massive range of their projects and programs efficiently. This project management also includes prominent features such as discovering and sharing information, project portfolio management, simplifying IT management, access from virtually anywhere, delivering the project successfully, and much more.

    Microsoft Project Server alternatives
  48. 48

    DevTrack is a cloud-based development and bug tracking system that provides development methodologies, businesses, and facilities communication between coding and testing teams. The key feature of this platform includes bulk issue editing, audit logs, APIS integration, and custom filters. It is a complete solution that manages different tasks related to product development by breaking down all the large features set into smaller sets that can be implemented within the module. With the help of this solution is developers can create multiple product development tasks under each module and track the completion of features sets based on project status.

    The system also allows you to maintain a product backlog where project supervisors prioritize some features set based on urgent needs and assign them to the team members. DevTrack solution implements a waterfall model using a milestone for each stage in the development process. The software creates sub-releases within the milestones to organize product delivery into the alpha, beta, and production versions. Like all the other similar development and bug tracking solutions, it also has a list of core features that make it better than others. It is available on multiple plans, and each plan has its own cost and core benefits.

    DevTrack alternatives
  49. 49

    EOS.Web is a cloud-based Document Management Solution built for special libraries. The solution exhibits inimitable scalability and flexibility that drive its support for the most distinctive knowledge management needs across all industries. It provides high-developed functionality that optimizes painstaking adaptation for special library customizations and needs. The solution utilizes industry-leading hosting, and security thereby guarantees optimal data security for all users.

    This tool also amplifies the platform’s elasticity in scaling that allows you to grow the solution with the increasing demand and requirements of your expanding business. One of its likable features is the cataloging functionality, a simple yet powerful option that makes it easy to manage your library’s authority and records. Its serial module functionality allows users to control series, journals, and supplement receipts irrespective of their location and publishing schedule. It provides an intuitive receipt prediction module that accommodates various regular and irregular publishing schedules. EOS.Web also has a list of core features that make it stronger than others.

    EOS.Web alternatives
  50. 50

    Azendoo is a project management and work tracking software solution that helps teams plan and share tasks, sync on projects, and communicates more efficiently. It works on almost all the platforms such as web, desktop, and mobile applications. The solution help companies to increase their productivity, align their various teams, and get work done. It is a complete solution and is specially designed for all sizes of businesses. In its role as an adept corporate assistant, the solution simplifies documents sharing, projects planning, and more.

    Compared to all the other similar platforms, it contains lots of new services and features to deliver a more realistic experience. The most prominent feature of Azendoo includes task management, group discussion, team projects, time tracking, dashboard, email to tasks, customized reports, set goals, task view, etc. Your office can build and organize your project tasks and delegate some of these tasks to your teammates so you can achieve your goals quickly as a team. Try it out if you want to manage your projects.

    Azendoo alternatives